PARENT: 560

SUPER PARENT: 559

WIND POWER FIELD QUILIANO ALTARE

Installed to: Quiliano Altare

Electrical power: 6 + 6 MWp

Type of system: SIX TURBINES Westas model WT80 – 2 MWp each

BM Greenpower provided the field turnkey, from construction works to installation of wind turbines, including the electrical system.