PARENT: 552

SUPER PARENT: 551

“PLUG & PLAY ” HYDROGEN

Installed in: Spiazzo ( TN )

Installed power: 20 kW

Turbine type: PELTON 1 jet

BM Greenpower provided the turnkey system with the installation of all electromechanical and hydraulic parts, turbine and control apparatus, electric command and control, supervision system and the entire container larch coated. The realization of all the works and water projects also included the connection to the existing water system have been supplied by the BM Group division.